Prague Playoffs 2021

Prague Playoffs 2021

Five days of preparations, four days of show jumping races and multimedia shows, three days of load out from O2 arena ... After a one-year break, the biggest horse sport event and the biggest challenge for us is the production and technical team.

After a one-year break, the world parkour has returned on its biggest trip to the O2 arena! After Mark Ztracený and Český Mejdan and Impulse, this third time we also found ourselves in the largest home hall this autumn. With respect to the current social situation, we returned for almost two weeks with the whole team to a job that is becoming increasingly rare.


And with us 10 trucks of audiovisual equipment, which brought to the ceiling 120 engines and 700m structures. 300 lights, mostly Robe (BMFL spot & washbeam, Forte, Strobe, Spiider, RoboSpot) with an output of over 250 kW took care of the lighting of the area and the accompanying show. The cabling was calculated for tens of kilometers and everything was prepared by over 50 technicians from our team.


In addition to technical support in the form of complete rigging, sound handling and, above all, lighting of both the racecourse and the audiovisual accompanying show, at PPO we also take care of the local production of the arena and the overall logistics of the event and suppliers.

???? GCL/Stefano Grasso, ???? DHC Prague Playoffs

Photo and video